Lehi Skilled Nurse Facility

Project Description

Scope of Work: Plumbing and mechanical systems including: DWV, roof drains, domestic plumbing, kitchen MAU and exhaust systems, building HVAC control systems, common area HVAC systems and individual tenant room HVAC and exhaust systems.

Location: Lehi, Utah

Owner: Howland Partners

General Contractor: R&O Construction

Architect: Babcock Design Group

Mechanical Engineer: Colvin Engineering Associates

Installed Plumbing and Mechanical Systems Value: $1,600,000.00

Project Duration: 12 months

Delivery Mode: Plan/Spec

Haemonetics

Haemonetics – ABA Assembly Line & Molding Systems Cleanroom

Haemonetics

Project Description

Haemonetics – ABA Assembly Line & Molding Systems Cleanroom Medical Office Building (Clean Room)

Location: Draper, Utah

Owner: AES Clean Technology Inc.

Construction Manager:

Architect:

Mechanical Engineer: RMM

Installed Mechanical System Value: $635,000.00

Project Duration: 2009

Delivery Mode: Design / Build

Mechanical System Scope of Work

  • Packaged Rooftop VAV w/ Fan Powered VAV Terminals
  • Hydronic Heating Water Generation and Distribution
  • Extensive Alerton Based DDC Building Automation by RMM Controls Personnel.
    • Incorporating Multiple Tenant Function
    • High Performance Energy Conservation Algorithms
    • Design
    • Programming
    • Installation
  • DWV, Domestic Water, Fuel Gas, Storm Drainage
  • HEPA Filtering for Clean Surgical Suites